We are getting down to the nitty gritty. It is
punch list time. I realized the contractor was scheduling the last of the sub appointments for this week and next, and we had to speak now or forever hold our peace. I made Albert walk through the addition on Sunday and help me make notes of all the little things. He actually got way more into it than I did, typing on his iPad enthusiastically. I finally discovered why Apple added cameras to iPads.
Evernote plus
iPad camera equals an
amazing punch list. I found myself saying, "I can live with it" kind of a lot. You get to this point. Plus Albert is really picky, if you ask me.
The contractor and I walked around the house this morning with me swiping through the list and him writing, and writing. I kept telling him I would email the punch list to him but he ignored me. I liked the way he handled the feedback, no nonsense, no excuses. And, at the end, he said we would do this one more time before we were finished. I like his style.
Pictures of progress -- it really all looks the same as last week, various tile cleanups, tub positioning, etc.
|
Bath tub sitting at the end (I can hardly wait) |
|
Reverse view from the bathtub |
|
We noticed that the ceiling line looked crooked ... so we requested
a re-do, always "no problem." |
|
Tile is being reworked. You could see the crooked line
quite well because of the "plank" style tile. |
|
Example of punch list item: bumpy ceiling near recessed light over tub. |
No comments:
Post a Comment
Comments keep things interesting and I respond to most.
Note: Only a member of this blog may post a comment.